Products
Contact Us
- Contact Person : Mr. Demi Wu
- Company Name : Shenzhen Heng Yi Automation Equipment Co.Ltd
- Tel : 86-0755-29933386
- Fax : 86-0755-29933389
- Address : guangdong,shenzhen,No.2 Xin Fa Western Road, Xin Fa Industrial Zone, ShaJing, BaoAn District Shenzhen China
- Country/Region : China
- Zip : 518101
Since The Manual Powder Coating Production Line
Product Detailed
Related Categories:Agricultural Product Stock
Powder coating production line Spray method: automatic spraying + manual spraying Process: the first floor of a - blowing dust - primer dusting - curing - cooling - quality polished - blowing dust - surface dusting - curing - cooling downstairs Specification for Engineering Materials for Suspension Conveyor Lines:Closed rail suspension conveyor chain, chain, track, track column, drive, speed control system, tensioner, a spreader, then oil pan, automatic Tanker 2. Main color powder automatic spray room: (2 sets) specification:Powder recovery cabinet + fan room: 2 sets 3. Curing furnace and thermal energy system engineering specifications A furnace bodyType: bake Road to use the system to the type of Kan, its unique mosaic structure with insulation in the form of multi-layer insulation materials to achieve special insulation effect; to make the whole boring Road has good integrity and can be visited, Bake around the use of package angle form. Drying furnace for the direct heating of gas-fired bridge drying tunnel, overhead, can be installed to the system type Structural features:Including the bake Road body, hot air circulation system, exhaust systems. Reasonable layout, make the baking tunnel to form a reasonable flow of hot air, but also effectively prevent the hot air spill to the workshop, saving energy while protecting the environment. In order to improve the insulation performance of the drying tunnel, it is necessary to install the workpiece profile door and the exhaust air cover at the entrances and exits of the drying tunnel; Exhaust gas exhaust: natural exhaust emissions, making the furnace exhaust can be discharged in time.B, thermal system4. Clean room isolation cleanTo ensure product quality, workpiece spraying, the need to achieve dust-free isolation. 5. PLC Electronic control system Coating production line equipment since the 70's began to develop, especially after the rapid development of reform and opening up.
Other products